Define Airbus’s Risk Management Plan/Program for the A380 project as a best practice in detail.
Then compare and contrast it to Boeing’s 787 Risk Management Plan/Program and rate/rank them systematically and draw conclusions based on your comparative analysis.
1-The story of maturation of the practice in the organization. How it was started? What it used to be? How it was evolved and why. What it is now at its best? (Maximum of 2.5 pages)
2- What is the known best practice or standard used in matured project management organization(s). Explain or elaborate on the same domain practice in this organization. (Maximum of 1.5 pages)
3-Comparative analysis of the two approaches or BPs. (Maximum of 1.5 page)
4-Conclusion (Maximum of 0.5 page)